Photo post from netservecabling.
December 24, 2022
Merry Christmas and a Prosperous New Year to all of our followers 🎄 We have been extremely busy on s...
Video post from netservecabling.
September 23, 2022
Carousel post from netservecabling.
July 12, 2022
Over 60 Category 6 cables installed, terminated and tested for an academy trust. Alongside the data ...
Carousel post from netservecabling.
May 15, 2022
Installation of new Cat5e cabling and containment works carried out at an industrial unit in Birming...
Carousel post from netservecabling.
April 30, 2022
Fibre installation, termination and testing at a manufacturing warehouse in Birmingham. We installed...
Carousel post from netservecabling.
April 27, 2022
Work carried out at a school in Atherstone, which involved the installation of 12 data points includ...
Photo post from netservecabling.
April 25, 2022
Yep, that’s definitely broken! #netservecabling . . . #structuredcabling #structuredcablingsystem #...
Carousel post from netservecabling.
April 22, 2022
High level emergency fibre repair carried out at an industrial unit in Birmingham. All up and runnin...
Carousel post from netservecabling.
April 20, 2022
Today’s job involved cabling for internal access points and door access control, including gate cont...
Carousel post from netservecabling.
April 18, 2022
Works are complete at this school in Coventry. Fibre link installed, terminated, tested and labelled...
Carousel post from netservecabling.
April 16, 2022
Large fibre install carried out at a MAT school based in Coventry. Installation of new Multimode fib...
Carousel post from netservecabling.
April 13, 2022
2 weeks of work complete. 4x OM3 fibre optic cabling and over 3500 metres of copper cable! #Netserve...
Carousel post from netservecabling.
April 11, 2022
We were on site for over 2 weeks installing at an aviation company. The job involved installation of...
Photo post from netservecabling.
April 08, 2022
Installation and termination of fibre in a prestigious country estate to extend wifi throughout the ...
Carousel post from netservecabling.
April 06, 2022
Fibre termination works carried out in central birmingham. Terminations were carried out for lift en...